Menu
Flood Control Permits
Title 17 of the Salt Lake County Code of Ordinances defines the Flood Control Permit Program.
Flood Control Permits are required for any activity occurring within 20 feet of the top of bank of a Flood Control Facility. This includes, but is not limited to:
- installation of structures or bridges
- storm water discharges
- utility line crossings
- bank stabilization
- landscaping
Flood Control Permit Application
Please click below if you would like to view the Flood Control Ordinance.
Questions? Contact Aaron Murphy at (385) 468-6626 or at AMurphy@slco.org
Need info on one of these instead?